RES
Share

Strategically Placed Solar Panels Do Not Disrupt Agriculture – Food and Electricity on the Same Plot
Instead of choosing between food production and electricity generation, farmers could potentially benefit from both, as confirmed by a new study from Michigan State University. It is not necessary to convert entire arable lands into solar farms; instead, panels can…

Long-Term Profitability of Renewable Energy in the Shadow of High Upfront Costs
The decision to transition to renewable energy sources as an alternative to fossil fuels is often questioned due to concerns about financial viability, with high initial costs being the primary factor. However, new research published by EMBER shows that such…

Power in Every Drop – How Rain Becomes Electricity
Energy is all around us – in the air, in the waves, and even in the grass beneath our feet. The key question is no longer whether energy exists, but whether we can harness it in the right way. In…

Installation of All Wind Turbines Completed in Kostolac
Elektroprivreda Srbije (EPS) has completed the installation of all 20 wind turbines within its first wind farm in Kostolac, marking the entry of this significant project into its final phase. The wind turbines, standing 179 meters tall, are distributed across…

Turkey’s Solar and Wind Potential on the Rise
The combined share of wind and solar energy in Turkey’s electricity generation reached 18 percent last year, according to Ember’s Turkey Electricity Review 2025, published for the fourth consecutive year, which analyzes electricity generation and consumption data. The increase in…

K2 Systems presents new façade systems
K2 Systems, one of the world’s leading manufacturers of photovoltaic mounting systems, is expanding its portfolio of façade systems and presenting the new K2 PerfoRail M. This clever solution allows PV modules to be installed on concrete facades with existing…

Planned Construction of a 250 MW Wind Farm Near Aleksinac
The Municipal Administration of the Municipality of Aleksinac has announced a public review of the Detailed Regulation Plan for the construction of the Bradarac Wind Farm, which will be available until April 20, 2025. Also included is the Environmental Impact…



