Enter your email address below and subscribe to our newsletter

thermal power plant

Will EPS Be Ready for the Winter?

In Kostolac B thermal power plant, the B2 unit overhaul has been completed and 350 megawatts unit is connected to the power grid. The plan is to have B1 unit online, after the capital overhaul in the second half of September, which…

INTERVIEW: Filip Radovic and Verica Jovanovic

SEPA AND BATUT: Key Partners for Improving EcoHealth The concern about the state of the whole ecosystem, contained in the conceptual goals of EcoHealth, requires interaction between all expert services and institutions of the health system and environmental protection. In order…

-->-->